- Solar tower Noor III

- Almonte TMD

- Hisgaura river bridge

- Honda bridge

- Algeciras bay monitorig

- Wind effects on   bridge railings

- Study of wind   effects for the Cadiz   bay brigde

- Study of wind   effects on extension   in tower Castellana   77

- Meteorological Mast
   Inch Cape

- Bay of Algeciras

- Swimming start    platform

 - Wind effects on a    photovoltaic park

 - Field monitoring

 - Meteorological Mast

 - Cadiz Bridge

 - Wind tunnel design

 - AVE bridge

 - New Marina tower

 - Solar collector

 - Skicross platform

 - FAV barrier

 - Solar tracker

 - Suspension bridge

 - Bicentenario towers

 - Solar panels

 - Pedestrian bridge

 

 

 


Tunel de Viento deteccion minas anti persona Puente AVE sobre río AlmonteTorre Nueva MarinaColector ParabólicoPlataforma Entrenamiento SkicrossOptimización Barreras AerodinámicasSeguidor SolarPuentes Suspendidos Para Tubería Sobre los Ríos Tajo y AlmonteTorres BicentenarioEstudio Paneles Solar DeckPasarela Peatonal Rio Miño

Oritia y Boreas has directly or indirectly participated in

over 50 projects in 5 continents.


THIRD MILLENNIUM BRIDGE (Zaragoza)

PORTA FIRA TOWER (Barcelona)

DESAFIO ESPAÑOLl TEAM, 32nd Americas Cup Challenger

STOREBAELT BRIDGE (Denmark)

TSING LUNG BRIDGE (Hong Kong)

MAUMEE RIVER BRIDGE (U.S.A.)

SERRALLO TOWER (Granada)

SOLAR TRACKER (U.S.A.)

LA SERRERIA BRIDGE (Valencia)

TORRE DEL AGUA (Zaragoza)

ÁGORA BUILDING (Valencia)

PUERTO TRIANA TOWER (Sevilla)

VEL E VENTS BUILDING (Valencia)

NOOR III SOLAR TOWER


Uarzazate, Morocco

The NOOR III phase of the Uarzazate Solar Power Station (Morocco) consists of a 250m tall central solar tower surrounded by a park of reflectors. Slender cylindrical structures, such as the NOOR III tower, are usually dynamically sensitive to wind and require special consideration.

Oritia & Boreas performed a full aeroelastic wind tunnel study of the central tower to determine the wind induced structural loading for design, along with an analysis of the aeroelastic stability of the tower up to and beyond maximum wind speeds expected at the site.

TUNED MASS DAMPER (TMD) ALMONTE RIVER BRIDGE

Cáceres, España

This study is a continuation of O&B involvement throughout the design and construction of the high-speed rail bridge crossing the Almonte River.

In this project, Oritia & Boreas collaborated with the constructor for assessing the design performance characteristics of a prototype TMD which was to be installed on the provisional cables used in the construction of the 350m arched span.

O&B designed and constructed a purpose built test-bench for capturing the response of the TMD to harmonic excitation, leading to an assessment of the TMD effective damping and design recommendations.

 

HISGAURA BRIDGE

Santander-Boyaca, Colombia

The 420m cable-stayed bridge is located at the border between the Santander and Báyaca departments, Colombia. The bridge crosses a valley of some 130m and is surrounded by relatively complex topography from all sides.

Section model tests were performed in the wind tunnel for assessing the equivalent static design loads and analysis of the aerodynamic stability.

HONDA BRIDGE

Tolima, Colombia

The Honda Bridge is located in the Tolima department of Colombia, crossing the Magdalena River. The central span of the cable-stayed bridge is 250m.

Oritia & Boreas investigated the aerodynamic stability and reported the equivalent static design loads of the bridge based on section model tests in the wind tunnel.

“ALGECIRAS SAFEPORT” METEO-OCEANIC RISK MANAGEMENT IN HARBOUR ENVIRONMENTS - PHASE I

Cádiz. Spain.

O&B was leader in an R&D project for developing a set of guidelines towards certifying the Harbour Meteorological-Ocean Risk Management System. The study was completed in partnership with the Environmental Hydraulics Institute of University of Cantabria (IH Cantabria); and the Harbour Research Laboratory (HRL) of the Polytechnic University of Madrid.


The project included the expansion of the ocean-meteorological monitoring network (wind, waves, agitation and currents) of the Algeciras Port Authority; development of wind/wave predictive modelling systems; a user orientated website of real-time publication of environmental data to aid in decision-making

WIND TUNNEL STUDY ON AERODYNAMIC OPTIMIZATION OF BRIDGE RAILINGS

 Constitution Bridge, Cadiz.

At deck height the cable-stayed bridge is exposed to relatively strong Atlantic winds, giving extra importance in the aerodynamic design of the lateral windshield railings.

Wind tunnel tests were performed on a large-scale section model to measure the static force coefficients on the railing system, combined with modal finite element analysis for providing wind loading and design recommendations.

FULL AEROELASTIC WIND TUNNEL STUDY OF CONSTITUTION BRIDGE


Cádiz, Spain.

Constitution Bridge is the longest and highest span cable-stayed bridge in Spain and the third largest in Europe, with a total length of 3082m, main span of 540m and deck height of 69m.

A full aeroelastic wind tunnel study was performed to examine the dynamic response and aerodynamic stability of the completed bridge, and to identify wind speeds associated to possible flutter instability and vortex shedding induced oscillations.

 

 


WIND TUNNEL STUDY OF TORRE CASTELLANA 77, MADRID


Madrid, Spain.

An additional four levels were added to an existing 97m tower located in the centre of Madrid (Paseo de la Castellana Nº77).

Pressure model tests were performed in the boundary layer wind tunnel for defining the structural loading distribution on the updated building design.

 


ENVIRONMENTAL MONITORING ON AN OFFSHORE SEAWALL


Algeciras Port Authority, Spain.

Expansion of the Algeciras Port Authority (APBA) environmental monitoring network with the installation of meteorological sensors on the Isla Verde offshore seawall.

Oritia & Boreas were responsible for the design, installation and maintenance of the new stations for real-time publication on the APBA and national port authority websites.


SWIMMING START PLATFORM


Centro de Alto Rendimiento, Sierra Nevada, España.

Design and construction of an instrumented swimming start platform for optimising athlete performance.

 


WIND EFFECTS ON A PHOTOVOLTAIC PARK


Puerto Rico.

Parametric study of wind effects and structural response on a 1-axis photovoltaic tracker park.

The study included pressure model tests in the boundary layer wind tunnel for determining the structural response on individual elements and the accumulated loading on the central control mechanism.



FIELD MONITORING OF AEOLIAN SAND TRANSPORT

Andalucia, Spain.

Remote monitoring of environmental conditions and sand transport for improving safety of the national high-speed train network in arid regions.

Oritia & Boreas were responsible for the installation and maintenance of a remove monitoring station and study of sand transport over a prolonged period; and the development of a meso-meteorological sand transport predictive tool to aid in decision making of the railway network management.



MONITORING OF CADIZ BRIDGE

Cadiz, Spain.

Cable staged bridge in Cadiz Bay with a main span of 150m.

Monitoring of enviromental conditions and structural loading during elevation of the bridge deck modules.


WIND TUNNEL DEVELOPED TO DETECT ANTI-PERSONNEL MINES

Colorado, USA.

The tunnel is a valuable tool for studying how various climatic variables, including wind circulation, interact with the intrusion and emission of gas contaminants in the subsoil.

The project was partially funded by the US Defence Ministry and will be a valuable tool for forwarding humanitarian aid.


HIGH SPEED RAIL BRIDGE OVER THE ALMONTE RIVER


Cáceres, Spain.

High speed rail bridge (Lisbon-Madrid line) with a total length of 996m and a principal concrete arch of 384m.

Wind loading study and evaluation of possible occurrence of aeroelastic effects and aerodynamic instabilities.


NEW MARINA TOWER

Casablanca, Morocco.

Hotel tower of 165m height with Conference Centre integrated into the podium.

Design wind loading and structural response study. Pedestrian level human comfort and safety estimation.

 


WIND EFFECTS ON PARABOLIC SOLAR COLLECTORS

FEDER-INNTERCONECTA Program

Coordinator: Abengoa Solar

Parametric study of wind effects on the structural supports of parabolic solar collectors. The study is based on physical simulations in the boundary layer wind tunnel, complemented by numerical simulations and full scale measurements on prototype structures.

 


SKICROSS TRAINING PLATFORM

CEI-BIOTIC · UGR Program

Optimization of athlete propulsion in the Skicross sport discipline.

Development and construction of a training platform to measure the correlation between athlete biomechanics and response times during the exit of the start platform.

 


OPTIMIZATION OF BRIDGE AERODYNAMIC BARRIERS


High speed railway network, Spain

Determination of wind loading on bridge barriers for structural design, improve bridge deck stability, comfort levels and security of high-speed rail traffic.

 


WIND EFFECTS ON A SOLAR TRACKER

Study of design wind loads and structural response of a 2-axis high concentration solar tracker.

Structural design optimization due to wind loads.

 


SUSPENSION BRIDGES OVER THE TAJO AND ALMONTE RIVERS

Caceres, Spain.

Suspension bridges with principal spans of 180m and 230m to improve the water supply to the Cáceres township and surrounding area.

Determination of structural response and identification of possible aerodynamic instabilities of the completed bridges.


BICENTENARIO TOWERS

Toluca, Mexico.

Metallic sculptures of 65m height, made up of two slender three-dimensionally curved elements.

Study of design wind loads and structural response. Fatigue analysis of selected structural elements not exposed to the wind.


ROOF MOUNT SOLAR PANELS

California, USA

Formulation of conversion factors of wind tunnel pressure coefficients for application with the Eurocode and Spanish national technical building standard.


PEDESTRIAN BRIDGE OVER THE MIÑO RIVER

Ourense, Spain.

Suspension bridge consisting of two inclined masts with a principal span of 110m.

Study of wind effects and dynamic response of the bridge deck. Evaluation of aerodynamic instability and determination of equivalent static loads of the completed bridge.